NGTE Pyestock 10
Comments
By Peter cole: I remember being in the control room in the sixties, being shown round by Ted Lifford one of the electrical engineers. There were steam turbines to start the system which would run to a speed so that the frequency matched the 50 cycles of the national grid. They could then switch to grid supply. I think he said the load would be too great starting from halted.